Controlling the opening sequence of the main parachutes

In this video we present how we control the opening sequence of the main parachutes. * Two devices are placed on each parachute. * They are started by the suspension lines pulling a plug * A timer is triggered when the reefing line is pulled tight * A cutter will cut the reefing line after a predetermined time

Leave a Reply


*