Pay with bank transfer

In order to donate via bank transfer, we will send our bank account details to your email. Please enter your email address here:

Dear readers,

In the last couple of months, we have had a leaky rocket …

It’s in the high-pressure system that there have been a few minor leaks. Most of the leaks have been found and sealed, but a few leaks remain. The last few leaks have shown troublesome to solve. We’ve investigated different solutions, such as bringing a high-pressure compressor with us out to the launch area to load helium up to an hour before launch! But the question is how big a leak can we really allow in the DPR system of Nexø II?

Let’s figure it out.

Leak searching on the high-pressure system of Nexø II. Photo: Thomas Pedersen.

Nexø II has two identical tanks for LOX and ethanol. The volume is 133 liters in total. When the engine is running, fuel will flow out of the tanks and helium will flow in to ensure a constant pressure in the tanks. For Nexø II, the pressure in the tanks is approx. 20 bars. When all the fuel is exhausted, the fuel tanks will thus contain 133 liters of helium at 20 bars. This correlates to 2660 standard liters (SL) of helium. As a minimum, we need the 2660 SL to run the Nexø II engine at its optimal operating point.

Nexø II has a 20-liter pressure tank with helium at approx. 300 bars. So, we have 6000 SL available. When a gas expands, it unfortunately cools down. When a gas cools down it consumes less volume. Due to the cooling effect we will only be able to utilize approx. 65% of the gas volume we have on board. So, we have nominally 6000 SL on board, but we can only use about 3640 SL, (300 bar – 20 bar) x 20 liters x 0.65.

However, there is still a big margin down to the required 2660 SL, we could leak about 1000 SL of helium and still be ok.

And how much is Nexø II leaking? We’ve measured that in a series of tests with nitrogen, but the final and crucial test was with helium.

Pressure and temperature from the DPR system on Nexø II. Illustration: Thomas Pedersen.

The first graph shows the pressure in the DPR tank over 100 hours. It’s seen that we pressurize it to approx. 345 bar, after which the pressure decreases. After approx. 23 hours the pressure has fallen to 275 bar and we pressurize it up to 345 bars again. The reason for this must be found in the graph of the temperature to the far right. As seen, we reach almost 40 degrees during the pressurization, it makes the gas expand when heated and contract when the gas cools to room temperature. In the second pressurization, where we only top up the helium, we see that the temperature only rises approx. 10 degrees, here the temperature effect is considerably smaller. This gives us a better picture of how much of the pressure loss is due to gas loss and how much it is due to the temperature effect.

Looking back on the first graph, you will see that there is also a red and a yellow line. These lines show pressure development if it is related only to the temperature effect. We can therefore directly see how much we lose due to temperature and how many we lose through a leak.

So where is the gas leak then? Well, on graph number 2 you see the pressure in the fuel tanks. It’s hard to see, but there are two lines that are just on top of each other. You can see that the pressure rises to 11 bars at approx. 45 hours. At that point someone has ventilated the fuel tanks manually.

So, we have a leak to the fuel tanks, but it’s not big enough to explain the total leak, so we’ve got a leak to the outside world too.

On plot number three, the amount of gas on board in the DPR tank in SL is also seen. As seen, we reach almost 6900 SL at 345 bars. What’s interesting is the amount of time from pressurizing of the DPR tank until we have lost to much helium.

We have calculated that we need at least 2660 SL (expanded) for the flight. In addition, the last 20 bars (400 SL) cannot be used because by then there is pressure balance between the DPR tank and the fuel tanks. If we calculate the 2660 expanded SL to pressurized SL via our 65% utilization estimate and add 400 SL, we’ll need the tank at lift off to contain minimum 4500 SL, equivalent to 225 bars. From the graphs we see that we won’t hit that level before around 100 hours after pressurization. Note, however, that the last pressurization was at 23 hours, so we have approx. 75 hours from pressurization of the DPR tank until liftoff.

That means we can pressurize the DPR tank on the day before and even though we will lose some, we still have lots of helium on board for the launch




Make a donation

Help us continue building rockets with a one time donation



Published by Thomas Pedersen on

8 Comments

Comments are closed.

Related Posts

Blog

BPM100 DPR?

Dear readers, Designing the world’s largest amateur rocket is not an easy task. It’s an iterative process with a lot of dependencies. One of the very important dependencies relates to the rocket’s « propellant delivery system », Read more…

Videos

Nexø II debriefing part 3: Flight Dynamics and data analysis

Some weeks ago we hosted a public debriefing event in Copenhagen. In this third video Flight Director talks about the Nexø II flight profile and lessons learned from the flight.

Videos

Nexø II debriefing part 2: Onboard cameras & the video transmitter

A few weeks ago we hosted a public debriefing event in Copenhagen. In this second video Alex Csete, OZ9AEC talks about the Nexø II onboard cameras and video transmitter built from COTS components.