MS spån og PTFE partikel i afgang
A look inside the valve cavity. Minute teflon tape flakes was found, but debris able to cause the malfunction was absent. Photo: Christian Ravn.
In order to donate via bank transfer, we will send our bank account details to your email. Please enter your email address here:
A look inside the valve cavity. Minute teflon tape flakes was found, but debris able to cause the malfunction was absent. Photo: Christian Ravn.
Tank pressure during the remaining 6 minutes before liftoff.
The pressure in the Nexø I tanks from start of tanking procedure until lift off.
Pressure sensor data from Nexø I during flight.
The LOX tank still contained a fair amount of LOX at splashdown, which boiled off in the water surface. Photo: Morten Bulskov.
Gz body load from Nexø I’s IMU.
uel temperature at cooling mantle inlet and at the injector.
Photo: Carsten Olsen.
July 23rd 4:38 PM, Nexø I launches from Sputnik. Photo: Carsten Olsen.
HEAT-2X and 1/3 LES being prepared for exhibit