Saturday in the Rocketshop 05/10 | INSIDE THE ROCKETSHOP: Episode 5
A quick look into the workshop happenings last weekend.
In order to donate via bank transfer, we will send our bank account details to your email. Please enter your email address here:
A quick look into the workshop happenings last weekend.
A quick look into the workshop happenings last weekend.
After increasing the hole diameter of our swirl injectors, we need to confirm how that changes their mass flow. Jeppe guides you through how to do just that.
A quick look into the workshop happenings last weekend.
After numerous leak tests and sealing tape applications, Adrian finally gets to see his reaction control system work.
Our intern Adrian walks us through his power supply electronics for his RCS thruster test setup.
A quick look into the workshop happenings this weekend.
In an attempt to mitigate the spin we saw with our last manned Ballute jump, we made and tested a small-scale design, which is sown from two sections – top and bottom, rather than single Read more…
A quick look into the workshop happenings last weekend.
A quick update on how we modify our swirl injectors to test how larger propellant holes influence their output.